Process
Six stages, from agreeing what each area has to do through to checking the installation in use.
- 1
Brief and survey
RIBA stage 0 to 1
Brief and survey
RIBA stage 0 to 1
Agree what each area is used for and the criteria it has to meet. Survey the existing installation where there is one.
- We need
- Floor plans, hours of use, known problems, programme and budget.
- You receive
- Survey report and a schedule of design criteria by area.
- 2
Concept and options
RIBA stage 2
Concept and options
RIBA stage 2
Develop outline schemes: luminaire types, mounting, control approach and budget cost.
- We need
- Comments on the options, and the intended finishes and layout.
- You receive
- Options report with indicative layouts and budget costs.
- 3
Detailed design
RIBA stage 3 to 4
Detailed design
RIBA stage 3 to 4
Build the calculation model, design emergency lighting and controls zoning, and coordinate with ceilings, racking and other services.
- We need
- Final layouts, ceiling and racking drawings, and design team comments.
- You receive
- Calculation report, layout drawings, luminaire schedule, controls specification and a fixed supply price.
- 4
Supply and installation support
RIBA stage 5
Supply and installation support
RIBA stage 5
Supply the equipment, answer the installer's queries and inspect the work in progress.
- We need
- The installer's programme and access to site.
- You receive
- Delivery schedule, product data and site inspection notes.
- 5
Commissioning and handover
RIBA stage 6
Commissioning and handover
RIBA stage 6
Set up the controls, measure illuminance against the design and test the emergency lighting.
- We need
- Access after dark or with daylight excluded, and attendance for training.
- You receive
- Commissioning report, record drawings, certificates and operation and maintenance information.
- 6
In use
RIBA stage 7
In use
RIBA stage 7
Review the installation after occupation, retune the controls and deal with warranty matters.
- We need
- Feedback from occupants and metered energy data where available.
- You receive
- Review note and revised control settings.
Common questions
Can you design from drawings alone?
For a new building, yes. For an existing building a survey confirms mounting heights, surface finishes and obstructions that drawings rarely show, and all three change the result.
What does design and supply mean for the specification?
We design the scheme and supply the equipment we specify. The luminaire schedule names each product and its photometric file, so the calculation can be checked independently.
Who installs the lighting?
An electrical contractor. We support them with layout drawings, answers to site queries and inspections, and we commission the installation when they have finished.
Can the calculation be submitted as evidence of compliance?
The report states the criteria, the maintenance factor and the results for each area, which is the information building control and environmental assessors ask for.