Six stages, from agreeing what each area has to do through to checking the installation in use.

  1. 1

    Brief and survey

    RIBA stage 0 to 1

    Agree what each area is used for and the criteria it has to meet. Survey the existing installation where there is one.

    We need
    Floor plans, hours of use, known problems, programme and budget.
    You receive
    Survey report and a schedule of design criteria by area.
  2. 2

    Concept and options

    RIBA stage 2

    Develop outline schemes: luminaire types, mounting, control approach and budget cost.

    We need
    Comments on the options, and the intended finishes and layout.
    You receive
    Options report with indicative layouts and budget costs.
  3. 3

    Detailed design

    RIBA stage 3 to 4

    Build the calculation model, design emergency lighting and controls zoning, and coordinate with ceilings, racking and other services.

    We need
    Final layouts, ceiling and racking drawings, and design team comments.
    You receive
    Calculation report, layout drawings, luminaire schedule, controls specification and a fixed supply price.
  4. 4

    Supply and installation support

    RIBA stage 5

    Supply the equipment, answer the installer's queries and inspect the work in progress.

    We need
    The installer's programme and access to site.
    You receive
    Delivery schedule, product data and site inspection notes.
  5. 5

    Commissioning and handover

    RIBA stage 6

    Set up the controls, measure illuminance against the design and test the emergency lighting.

    We need
    Access after dark or with daylight excluded, and attendance for training.
    You receive
    Commissioning report, record drawings, certificates and operation and maintenance information.
  6. 6

    In use

    RIBA stage 7

    Review the installation after occupation, retune the controls and deal with warranty matters.

    We need
    Feedback from occupants and metered energy data where available.
    You receive
    Review note and revised control settings.

Common questions

Can you design from drawings alone?

For a new building, yes. For an existing building a survey confirms mounting heights, surface finishes and obstructions that drawings rarely show, and all three change the result.

What does design and supply mean for the specification?

We design the scheme and supply the equipment we specify. The luminaire schedule names each product and its photometric file, so the calculation can be checked independently.

Who installs the lighting?

An electrical contractor. We support them with layout drawings, answers to site queries and inspections, and we commission the installation when they have finished.

Can the calculation be submitted as evidence of compliance?

The report states the criteria, the maintenance factor and the results for each area, which is the information building control and environmental assessors ask for.