Distribution centre

Installed load down 64% before control savings, with almost double the light in the aisles.

Lighting for warehousing and logistics

0 lux

Aisle illuminance

was 95 lux

0

Uniformity

was 0.31

0 kW

Installed load

was 136 kW

Head office refurbishment

Installed load down 60%, with the standard for desk illuminance and glare met on every floor.

Lighting for offices

0 lux

Desk illuminance

was 340 lux

UGR 0

Glare rating

was UGR 25

0 kW

Installed load

was 41.6 kW

Precision engineering works

Installed load down 48%, with twice the general illuminance and no shadowing at the benches.

Lighting for manufacturing and assembly

0 lux

General illuminance

was 260 lux

0 lux

Inspection benches

was 260 lux

0 kW

Installed load

was 49.5 kW